Description : 2,000 km line along the coast connecting with the existing Ghana– Nigeria line with a capacity of 1,000 MW
Programme Reference
Country selection
oldmapid
1219
Key Results
Sierra Leone is among the 37 African countries that have completed a rapid assessment and gap analysis for the SE4ALL by 2014 out of the 42 countries that endorsed the initiative. The country has developed its Action Agenda, which was validated