Project : TAH programme

Description : This is phase I of the continental connectivity programme that focuses on completion and standardisation of the TAH missing links by 2030

 

Project : Single African Sky phase 1 (design and initial implementation)

Description : Single African Sky is a continental programme that will create a high-level, satellite-based air navigation system for the African continent

 

Project : Yamoussoukro Decision implementation

Description : Accelerate Yamoussoukro Decision implementation by identifying countries that are ready to fully implement it, and discussing and agreeing with both their governments and airlines to launch the voluntary club on a full membership basis;                               

 

Project : ICT Enabling Environment

Description : This programme would improve the environment for the private sectors to invest in high-speed broadband infrastructure

 

Project : ICT Terrestrial for Connectivity

Description : This programme has two main components: secure each country connection by at least two broadband infrastructure and ensure the access to submarine cable to all landlocked countries

 

Project : Internet Exchange Point (IXP) programme

Description :  The aim of this programme is to provide Africa with adequate internet node exchange to maximise internal traffic

 

Project : Rusumo Falls

Description : Hydropower production of 61 MW for Burundi, Rwanda and Tanzania

 

Project : Central Corridor

Description : This programme would modernize the third priority ARTIN corridor in East Africa and facilitate travel for people and goods across the borders between Tanzania, Uganda, Rwanda, Burundi and DRC

 

Project : Dar es Salaam Port Expansion (DFS)

Description : To increase cargo throughput; handle larger vessels in the container, liquid and dry bulk trades; improve interfaces across transport modes; improve linkage services with rail services

 

Project : Zambia-Tanzania-Kenya Transmission Line (DFS)

Description : Promoting power interconnection across the continent and facilitating the creation of a Pan African power market.

Country selection
oldmapid
1156
Key Results
The Rusumo Falls projects aims to create hydropower production of 61 MW for Burundi, Rwanda and Tanzania
The Dar es Salaam Port Expansion (DFS) project aims to increase cargo throughput; handle larger vessels in the container, liquid and dry bulk trades; improve interfaces across transport modes; improve linkage services with rail services
The Batoka Hydropower (DFS) is a plant based in the Zambezi River Basin, with an installed capacity of 1,600 MW, to enable the exporting of electricity
Zambia-Tanzania-Kenya (ZTK) Interconnect aims to promote power interconnection across the continent and facilitate the creation of a Pan African power market. The Government of Zambia and SADC, with the support of the NEPAD Agency are fast-tracking Zambia-Tanzania-Kenya (ZTK) Power generation Transmission Project. An Inter-Governmental Memorandum of Understanding (IGMOU), which provides for a framework under which the project should be developed is in place. Phase one (Kenya-Tanzania component) is to be completed by December 2016, while phase two (Tanzania-Zambia component) will be commissioned by December 2018. The feasibility study has been finalized