Project : TAH programme

Description : This is phase I of the continental connectivity programme that focuses on completion and standardisation of the TAH missing links by 2030

 

Project : Single African Sky phase 1 (design and initial implementation)

Description : Single African Sky is a continental programme that will create a high-level, satellite-based air navigation system for the African continent

 

Project : Yamoussoukro Decision implementation

Description : Accelerate Yamoussoukro Decision implementation by identifying countries that are ready to fully implement it, and discussing and agreeing with both their governments and airlines to launch the voluntary club on a full membership basis    

 

Project : ICT Enabling Environment

Description : This programme would improve the environment for the private sectors to invest in high-speed broadband infrastructure

 

Project : ICT Terrestrial for Connectivity

Description : This programme has two main components : secure each country connection by at least two broadband infrastructure and ensure the access to submarine cable to all landlocked countries

 

Project : Internet Exchange Point (IXP) programme

Description :  The aim of this programme is to provide Africa with adequate internet node exchange to maximise internal traffic

 

Project : North–South Power Transmission Corridor

Description : 8,000 km line from Egypt through Sudan, South Sudan, Ethiopia, Kenya, Malawi, Mozambique, Zambia, Zimbabwe to South Africa

 

Project : Mphamda-Nkuwa

Description : Hydroelectric power plant with a capacity of 1,500 MW for export on the SAPP market

 

Project : Beira-Nacala Multimodal Corridors

Description : Rehabilitation/reconstruction of railway and road links, including one-stop border posts along the corridors. Improvement of capacity at the ports, including capital dredging at Beira Port. Natural resources development, including Moatize Coal Field in the Zambezi Valley will use the ports as main export gateways

 

Project : Southern Africa Hub Port and Rail Programme

Description : This programme aims at responding to Southern Africa challenge in developing sufficient port capacity to handle future demand from both domestic sources and landlocked countries

Country selection
oldmapid
1145
Key Results
Encouraged pension and sovereign funds to increase their investments from its currently low base of 1.5% to an impactful 5%
A model law to enhance investment in trans-boundary infrastructure has been developed with the aim to provide policy legal and regulatory support to guide countries in the tariff setting and subsidy design
The Single African Sky is a continental programme to create a high-level, satellite-based air navigation system for the African continent. The initiative will see the liberalisation of civil aviation in Africa which in-turn will enhance connectivity, and spur trade and tourism, and employment creation. The Single African Air Transport Market was launched in January 2018
The TAH programme is phase I of the continental connectivity programme that focuses on completion and standardisation of the TAH missing links by 2030
The Yamoussoukro Decision implementation aims to accelerate the Yamoussoukro Decision implementation by identifying countries that are ready to fully implement it, and discussing and agreeing with both their governments and airlines to launch the voluntary club on a full membership basis
The ICT Enabling Environment programme aims to improve the environment for the private sectors to invest in high-speed broadband infrastructure
The ICT Terrestrial for Connectivity programme has two main components: a) secure each country connection by at least two broadband infrastructure; and b) ensure access to submarine cable to all landlocked countries. Mozambique is one of the participating countries
Internet Exchange Point (IXP) programme aims to provide Africa with adequate internet node exchange to maximise internal traffic
The North–South Power Transmission Corridor project involves the construction of a 8,000 km line from Egypt through Sudan, South Sudan, Ethiopia, Kenya, Malawi, Mozambique, Zambia, Zimbabwe to South Africa
The Mphamda-Nkuwa is a hydroelectric power plant with a capacity of 1,500 MW for export on the SAPP market
The Beira-Nacala Multimodal Corridors entails the rehabilitation/reconstruction of railway and road links, including one-stop border posts along the corridors. Improvement of capacity at the ports, including capital dredging at Beira Port. Natural resources development, including Moatize Coal Field in the Zambezi Valley will use the ports as main export gateways
The Southern Africa Hub Port and Rail Programme aims at responding to Southern Africa challenge in developing sufficient port capacity to handle future demand from both domestic sources and landlocked countries