Project : TAH programme

Description : This is phase I of the continental connectivity programme that focuses on completion and standardisation of the TAH missing links by 2030

 

Project : Single African Sky phase 1 (design and initial implementation)

Description : Single African Sky is a continental programme that will create a high-level, satellite-based air navigation system for the African continent

 

Project : Yamoussoukro Decision implementation

Description : Accelerate Yamoussoukro Decision implementation by identifying countries that are ready to fully implement it, and discussing and agreeing with both their governments and airlines to launch the voluntary club on a full membership basis   

 

Project : ICT Enabling Environment

Description : This programme would improve the environment for the private sectors to invest in high-speed broadband infrastructure

 

Project : ICT Terrestrial for Connectivity

Description : This programme has two main components : secure each country connection by at least two broadband infrastructure and ensure the access to submarine cable to all landlocked countries

 

Project : Internet Exchange Point (IXP) programme

Description :  The aim of this programme is to provide Africa with adequate internet node exchange to maximise internal traffic

 

Project : Sambangalou Hydropower Project (DFS)

Description : 128 MW of hydropower capacity, 930 km from the mouth of the Gambia River to supply Senegal, Guinea, Guinea Bissau and Gambia

 

Project : West Africa Power Transmission Corridor

Description : 2,000 km line along the coast connecting with the existing Ghana– Nigeria line with a capacity of 1,000 MW

 

Project : Praia-Dakar-Abidjan Multimodal Corridor

Description : This programme would improve marine transport and the connection between island and mainland countries by creating a new maritime service between regional ports and facilitating this with a modern information system that links the maritime service with ports and road corridor in the Dakar-Abidjan Corridor. This programme would also modernize one of the most heavily travelled ARTIN corridor in West Africa (trade facilitation, OSBPs, capacity enhancement possibly through PPP)

 

Project : Gourbassy

Description : Multipurpose dam located in Guinea : regulation of the Senegal river (four countries)

Country selection
oldmapid
1136
Key Results
Sambangalou Hydropower Project (DFS) which is purposed at generating 128 MW of hydropower capacity, 930 km from the mouth of the Gambia River to supply Gambia, Guinea, Guinea Bissau and Senegal
The West Africa Power Transmission Corridor programme aims to create a 2,000 km line along the coast connecting with the existing Ghana– Nigeria line with a capacity of 1,000 MW
Praia-Dakar-Abidjan Multimodal Corridor programme would improve marine transport and the connection between island and mainland countries by creating a new maritime service between regional ports and facilitating this with a modern information system that links the maritime service with ports and road corridor in the Dakar-Abidjan Corridor. This programme would also modernize one of the most heavily travelled ARTIN corridor in West Africa (trade facilitation, OSBPs, capacity enhancement possibly through PPP)