Project : Missing Links on the Trans-Sahara Highway

Description : Construction of 225 km of road between Assamakka and Arlit, Niger

Estimated total cost : USD102 million 

 

Project : Optic fibre Link between Algeria and Nigeria via Niger

Description : Installation of 4 500 km of terrestrial optic fibre cable

Estimated total cost : USD80 million

 

Project : Dakar-Ndjamena-Djbouti Road/Rail Project

Description : An 8 715 km road/rail project which entails combining TAH 5 (Dakar to N’djamena) and TAH 6 (N’djamena to Djibouti)

Estimated total cost : USD2.21 billion for the road link and USD5.95 for the rail section

 

Project : Unblocking Political Bottlenecks for ICT Broadband and optic fibre Projects Linking Neighbouring States

Description : The use of political gravitas and goodwill to unblock and facilitate political bottlenecks affecting the implementation of ICT broadband and optic fibre projects on the continent

 

Country selection
oldmapid
1170
Key Results
The Missing Links on the Trans-Sahara Highway Project entails the construction of 225 km of road between Assamakka and Arlit, Niger
The Optic fibre Link between Algeria and Nigeria via Niger entails the installation of 4 500 km of terrestrial optic fibre cable, costed at USD 80 million
The Dakar-Ndjamena-Djbouti Road/Rail Project stretches 8,715 km of road and rail from Senegal to Djibouti. A total cost of USD2.21 billion is estimated for the road link and USD5.95 for the rail section
The Unblocking Political Bottlenecks for ICT Broadband and Optic Fibre Project uses political gravitas and goodwill to unblock and facilitate political bottlenecks affecting the implementation of ICT broadband and optic fibre projects on the continent